Work in Progress

Please do not dump leaves and debris in the ditches as it causes drainage tiles to stop up and roads to flood when it rains.

Blount County covers 567 square miles and has approximately 833 miles of roads. Given our current budget, we were able to pave 26 miles last year.

​Please be aware and use caution when approaching our mowing crews. We have six side mount bush hog mowers and three long arm mowers, we mow every road in the county based on routes five times each on both sides with a triple cut which works out to be almost 25,000 miles of road per season and if you stretch it out it is the equilavent to driving from Maryville to San Fransico and back on a mower 5 times, please be patient as it takes time to complete this process.

jgreen1
mow2
longarm82_4
We were able to pave the roads shown below this year



Rivers Edge
IMG_1775
IMG_1779
IMG_1782
IMG_1995
IMG_2002
IMG_2003
IMG_1993
IMG_2004
Six Mile Cemetery
IMG_1942
IMG_2081
IMG_1955
IMG_2090
IMG_1954
IMG_2088
Tee Delozier
IMG_1959
IMG_1962
IMG_2092
IMG_2098
IMG_1964
IMG_2096
We have completed the bridge replacement on Andy Harris Rd.
ANDYHARRIS B1
ANDYHARRIS B2
ANDYHARRIS D1
ANDYHARRIS D2
ANDYHARRIS A2
ANDYHARRIS A4
ANDYHARRIS A3